Close search
0
If you’re interested in exploring our work we recommend using our intelligent filtering; but if you have something more specific in mind, please go ahead and search above...View Work
If you’re interested in exploring our work we recommend using our intelligent filtering; but if you have something more specific in mind, please go ahead and search above...Use Work Filter
Back to Top
Sydney 2000 Olympic & Paralympic Games Stadium Australia
Specifications
  • Location
    Edwin Flack Ave Sydney Olympic Park, Sydney
  • Completion
    January 1, 1996 — September 28, 2000
  • Services
    Architecture
Image View

Architecture

Stadium Australia hosted some of the most iconic moments of the Sydney 2000 Olympic and Paralympic Games

When Sydney had its, “and the winner is…” moment on 24 September 1993, the 2000 Olympic and Paralympic Games was set to catalyse change across the city. The same moment set in motion key manoeuvres that would position BVN's earlier incarnation, Bligh Voller, to deliver significant Olympic infrastructure. In 1994, a joint venture with the Lobb Partnership (now Populous) established Bligh Lobb Sports Architecture (now BVN) to bid for Games projects. The most significant project won and delivered under this banner was Stadium Australia (now named Accor Stadium).

Stadium Australia delivered 110,000 seats for the Games with temporary north and south stands.

Bligh Lobb was selected to be part of the Multiplex team to bid for the project. A Build Own Operate and Transfer (BOOT) form of procurement was used, requiring a fully resolved and costed design. Even though the tender was demanding, it provided a valuable opportunity for an Australian firm to play a major role in the 2000 Games. The Multiplex pitch was ambitious – 110,000 seats with the ability to reduce to 80,000 after the Games, the strength to support a closing roof in future and a flexible seating bowl that could accommodate cricket and all football codes in legacy mode.

The Homebush Bay master plan 

for Olympic Park was based upon a grand north south boulevard running from Haslams Creek in the north to the Sydney Tennis Centre in the south.The boulevard widens into a grand central plaza and park opposite the stadium providing space for thousands of visitors to mingle and navigate to the various venues. Passengers arriving by train are discharged directly into this plaza, embraced by the imposing presence of the stadium and the pre-event buzz of the crowd.

Stadium Australia (later named ANZ Stadium) after its post-Games conversion against the backdrop of Olympic Park and the Paramatta River

The architecture and structure were significant contributors to Bligh Lobb securing the project. Simple and powerful geometric devices provide the structural solution and define its memorable form. The high seating capacity is accommodated in a 275 metre diameter plan with the majority of the crowd on the east and west. Two massive hyperbolic paraboloid trussed arches support the leading edges of the roof 

Arch being manouvered into its springing point at one end.

, spanning the seating bowl from north to south with sightlines dictating their dramatic height and curves. The trusses come to rest on four prominent concrete thrust blocks that frame the convex curve of the roof on the short sides. The east and west stands brace the main trusses and support additional roof loads and the seating tiers. 

Arch trusses during construction.

A diagonal grid of connecting trusses support a polycarbonate roof that modulates sunlight and creates ideal conditions for TV broadcast.

Perhaps coincidentally, the arrangement is reminiscent of the harbour bridge, aesthetically and structurally, the grandeur and elegance of its strong curves taking their place in Sydney iconography.

One of the four spiral ramp towers that served an essential function as fire escapes.

Four thrust blocks transfer roof loads to ground.

Prefabrication played an essential part in achieving the cost and time targets that enabled the comparatively short 2½ year construction time with trusses and seating platforms progressing off site in parallel to the main concrete structure. Many innovative construction methods were developed in a high-pressure fast track format.

In response to the aspiration for Sydney 2000 to be the green games, environmentally friendly features were integral to the design. Most significantly was the lightness of the roof, which contained less steel than many comparable Olympic stadiums. This was matched with water collection and re-use, natural ventilation and cooling strategies and daylighting to reduce power consumption. Future-proofing for post games modification was aimed at achieving maximum utilisation and longevity.

The stadium successfully hosted the opening and closing ceremonies of the Olympic Games and Paralympics, the track and field events, the soccer final and marathon finish to capacity crowds. It provided the background for dramatic and emotional events that captured the focus of the world, memorably Kathy Freeman’s lighting of the cauldron and defining 400 metre win.

Cross Section, from “Stadium Australia: for 2000 Olympics” by Morley, King and Ashfield.
Share
Save
Share
Sydney 2000 Olympic & Paralympic Games Stadium Australia
Share via:
Or
Copy link...
This page has been added to your custom collection. You now have 0 saved item.View Collection

Related Work

Brisbane
Level 3, 12 Creek Street
'The Annex'
QLD 4000
AUS

+ 61 7 3852 2525
brisbane@bvn.com.au

London
The Black & White Building
74 Rivington Street
London EC2A 3AY
UK

+44 20 4570 4086
london@bvn.com.au

New York
Neuehouse
110 E 25th Street
New York NY 10010
USA

+1 (347) 622 7345
newyork@bvn.com.au

Sydney
Level 11, 255 Pitt Street
NSW 2000
AUS


+ 61 2 8297 7200
sydney@bvn.com.au