Close search
0
If you’re interested in exploring our work we recommend using our intelligent filtering; but if you have something more specific in mind, please go ahead and search above...View Work
If you’re interested in exploring our work we recommend using our intelligent filtering; but if you have something more specific in mind, please go ahead and search above...Use Work Filter
Back to Top
Beijing 2008 Olympic & Paralympic Games Tennis Centre, Hockey and Archery
Specifications
  • Location
    Beijing National Tennis Centre 2 Lincui Road, Chaoyang
  • Completion
    July 1, 2005 — August 1, 2007
  • Size
    26500m2 GFA
  • Services
    Architecture
Image View

Architecture

Beijing Olympic Green was created to be the centrepiece for the 2008 Olympic and Paralympic Games.

Located in the north of urban Beijing, this monumental site is over 11 square kilometres in area and extends for 5 kilometres, by far the largest Olympic Games site ever created. Added significance was awarded to the site by aligning it to the city’s historical south-north cultural axis running through Tiananmen Square and the Forbidden City, thereby reinforcing the urban framework.

Olympic Green is divided into three sections, the south zone or Asian Games Stadium cluster, the central zone or Olympic Stadium cluster and the north zone containing Olympic Forest Park. The park is a 680 hectare man-made landform of hills, forests, meadows and bodies of water providing the northern terminus of Olympic Green and a legacy for generations of Beijing residents. The tennis centre, designed by BVN, is located in a privileged position overlooking the park on its western edge.

The tennis centre provides a typical grand slam collection of courts, an 11,000-seat centre court stadium, 4,000 and 2,000-seat show courts, 8 match courts all with 200 seats and 6 private practice courts without seating. The back of house and player’s facilities are underneath the show court and parts of the centre court.

The complex is ordered by three elevated platforms connected by a central public concourse that steps up from west to east. This configuration establishes a two-level arrangement with the main public circulation at the upper level and the sunken bowls and support facilities below. As these are entered from the internal service road of Olympic Park to the east, it provides an excellent degree of operational separation ideally suited to the functional needs of any major event.

Entering the centre court stadium from the concourse, spectators find themselves at the mid-level, allowing easy access to the upper and lower bowl seating, while the players enter discretely from their private zone at the level of sunken court.

The edges of the elevated platforms are defined by deep horizontal concrete bands 

that float above the ground interrupted only by various entry points and openings to the accommodation below. Recessed landscaped courtyards, large lightwells and perimeter windows provide daylight and ventilation to these facilities.

The dramatic upper bowl of the stadium is formed from twelve equal segments giving the stand its distinctive flower shape. The raking surfaces of the bowl fold into a dramatically cantilevering roof that shades two thirds of the seats. The openings between the segments permit views out and release heat that collects in the upper bowl, inducing a slow cyclonic airflow for the comfort of players and spectators.

This natural ventilation strategy is the most important aspect of the project’s sustainability, but other measures include sewerage recycling, stormwater harvesting, solar hot water, natural ventilation and daylighting. The effectiveness and directness of these has reduced the requirement for energy consuming systems.

The tennis centre is both clearly organised and memorable with a symbolic and distinctive centre court as the climax of the architectural composition - a direct and elegant tectonic solution. The distinction of the architecture is achieved through the expressive potential of its components articulated with a precise and efficient purpose.

The Process

View as Slideshow
Site Plan
Site Plan
The Process (Gallery)
Site Plan
Site Plan
01 of 08

Credits

BVN
Namaste Burrell, Rose Emerton, Kirsten Karst, Lawrence Nield, Michael Persch, Glenn Scott, Ross Seymour, Hamish Watt
Collaborators

CCDI

Consultants

CSCEC

Collaborators

CCDI

Consultants

CSCEC

Photography

John Gollings

Awards

2008 Australian Institute of Architects, Commendation for International Architecture

Share
Save
Share
Beijing 2008 Olympic & Paralympic Games Tennis Centre, Hockey and Archery
Share via:
Or
Copy link...
This page has been added to your custom collection. You now have 0 saved item.View Collection

Related Work

Brisbane
Level 3, 12 Creek Street
'The Annex'
QLD 4000
AUS

+ 61 7 3852 2525
brisbane@bvn.com.au

London
The Black & White Building
74 Rivington Street
London EC2A 3AY
UK

+44 20 4570 4086
london@bvn.com.au

New York
Neuehouse
110 E 25th Street
New York NY 10010
USA

+1 (347) 622 7345
newyork@bvn.com.au

Sydney
Level 11, 255 Pitt Street
NSW 2000
AUS


+ 61 2 8297 7200
sydney@bvn.com.au